Power project

Gemini Solar + Storage

Clark County, Nevada · Generation + storage

In service — documented

The developer announced full commercial operation in July 2024, after reporting supply-chain and inflation challenges.

The battery shifts energy in time. Its power and energy ratings are not additional continuous solar generation.

Last documented milestone:
Sources checked: September 7, 2026

Developer / operator
Primergy / Quinbrook
Technology
Solar generation and battery storage

What the equipment is rated to do

Solar generation rating
690 MW
Original rating ↗
Battery discharge-power rating
380 MW
Original rating ↗
Operator-reported battery energy
1,400 MWh
Original rating ↗

Capacity is not annual energy output or guaranteed availability. MW and MWh describe different quantities.

The documented hurdles

  • Equipment / commissioningHistorical hurdle

    The developer says it navigated supply-chain and inflation challenges before service; it does not identify them as current blockers.

The dated trail

  1. Commercial operation announced

    Primergy and Quinbrook reported the solar and co-located battery system fully operational.

Open the supporting records

  1. 1. Operator announcement · Primergy / Quinbrook

    Gemini solar and storage reaches commercial operation

    Solar power, battery discharge power and stored energy are distinct quantities. Supplier and inflation challenges are the developer’s account.

    Publication: 2024-07-18 · Checked: 2026-09-07
    Location in source: Opening announcement; 690 MW solar and 380 MW / 1,400 MWh storage paragraphs

    Source record: gemini-operation