Source document
Palisades begins fuel loading ahead of restart
Holtec International
Fuel loading is a restart milestone, not proof of commercial generation. The owner’s 805 MWe rating is retained as stated.
Open the original source ↗- Record type
- Operator announcement
- Publication date / scope
- 2026-08-30
- Last checked
- 2026-09-07
- Relevant location
- Opening paragraphs: fuel loading, Mode 6, refurbishment and 805 MWe design output
- Stable source ID
- palisades-fuel-loading
Where this source is used
Palisades restart
Holtec reported the start of fuel loading on August 30, 2026, a step toward—not proof of—commercial generation. Last documented milestone: August 30, 2026.