Source document
SunZia transmission enters operation
Hitachi Energy, with Pattern Energy
The 3,000 MW figure is transmission capability, not wind-generation nameplate capacity or measured annual electricity delivery.
Open the original source ↗- Record type
- Supplier / operator announcement
- Publication date / scope
- 2026-06-19
- Last checked
- 2026-09-07
- Relevant location
- Opening bullets and first three paragraphs
- Stable source ID
- sunzia-hvdc-operation
Where this source is used
SunZia Transmission
Hitachi Energy and Pattern Energy reported the transmission link fully operational in June 2026. Last documented milestone: June 19, 2026.