Source document
Grain Belt Express project description
Invenergy / Grain Belt Express
The stated 5,000 MW is planned transmission capacity. Promotional savings and data-center equivalents are not treated as measured outcomes.
Open the original source ↗- Record type
- Developer project page
- Publication date / scope
- Current page; checked September 7, 2026
- Last checked
- 2026-09-07
- Relevant location
- Powering Savings section and private-sector-led investment description
- Stable source ID
- grain-belt-project
Where this source is used
Grain Belt Express
DOE terminated its conditional Phase 1 financing commitment in July 2025. The developer continues to describe a privately led transmission proposal. Last documented milestone: July 23, 2025.