Grain Belt Express project description

Invenergy / Grain Belt Express

The stated 5,000 MW is planned transmission capacity. Promotional savings and data-center equivalents are not treated as measured outcomes.

Open the original source ↗
Record type
Developer project page
Publication date / scope
Current page; checked September 7, 2026
Last checked
2026-09-07
Relevant location
Powering Savings section and private-sector-led investment description
Stable source ID
grain-belt-project

Where this source is used

Grain Belt Express

DOE terminated its conditional Phase 1 financing commitment in July 2025. The developer continues to describe a privately led transmission proposal. Last documented milestone: July 23, 2025.